Our bathroom remodeling process
Five steps, from the first visit to the final walkthrough. One Nomi team runs all five, so you always know what happens next and who to call.
The process at a glance
- 01Free consultationWe meet at your home, hear your ideas and measure the room. You leave with a price.
- 02DesignPick every tile, fixture and finish with your designer. Then you get a fixed price.
- 03OrderingWe buy every material before day one and deliver it on your start day.
- 04The buildOne Nomi crew builds it, with a project manager and daily updates in our app.
- 05WalkthroughWe walk the finished room with you. A 2-year workmanship warranty backs it.
Free consultation
It starts with a conversation in your bathroom.
We meet at your home, at a time that works for you. We talk through your ideas, the scope and how you use the room, and we measure it. Rather talk first? Book a free phone call with a Nomi consultant.
By the end of the meeting, you have a price for your remodel. It is based on allowances for materials, so you know what to expect before you design anything.
Design
One meeting to pick every tile, fixture and finish.
Meet your Nomi designer at your home, at a showroom, or online. We bring the samples and help you choose all your materials. Most designs are done in one meeting. A larger room may take a second.
For a shower-only project, the design is often finished at the first meeting, and we move straight to construction.
When the design is done, you get a fixed-price scope of work. It lists everything we will build and what it costs. Browse bathroom ideas before you meet


Ordering
You never wait at home for a delivery.
Nomi buys all the materials for your project before it starts. They arrive at our warehouse, and we bring them to your home on your start day. A few large items ship straight to your house on day one.
Where your city requires a permit, we get it. Before we start, clear your things out of the bathroom, and keep jewelry, cash and firearms in a secure place outside the work area. We handle the rest.
The build
One crew builds it, from demolition to the last detail.
We remove and replace everything in the wet area. Then we waterproof the floors and walls with an advanced waterproofing system before any tile goes up. How we waterproof a shower
Your designer is your contact during design. Your project manager is your contact during construction. Both are full-time Nomi employees. You get daily updates in our app, so you can follow along even when you are not home.
You can live in your house the whole time. We use dust control to keep the rest of your home clean.

Walkthrough and warranty
We walk the finished room with you.
When the work is done, we walk through it together. If anything is not right, we work with you to fix it.
Every remodel comes with a 2-year workmanship warranty on labor and installation. Many materials carry their own manufacturer warranty, and we help you file the claim if a material fails. For a warranty request, call 800-371-8970. Our warranty policy
How long it takes
Most bathrooms are built in days, not months.
Here is how long the build takes in your home, once the design is final and the materials are ordered.
- Bathtub remodel
- 2 days
- Shower remodel
- 4 days
- Tub to shower conversion
- A few days
- Double shower
- 5 days
- Bathroom floor added
- +2 to 3 days
- Complete bathroom renovation
- 2 to 3 weeks
What it costs, and how you pay
You see the full price before we start, and it rarely changes.
A guest bathroom runs $20,000 to $40,000. A master bathroom runs $40,000 to $120,000. A shower or a tub on its own runs $15,000 to $25,000. Every number includes design, labor and materials.
All costs are shown at your design meeting. A $1,000 deposit starts the design and comes off your project total. The rest is due on completion.
We replace everything in the wet area, so there is little left to surprise us. If demolition uncovers a hidden problem, your project manager calls you with the options first. These repairs usually run $100 to $500.
“All we did was choose the shower fixture, type of glass door and tile, NOMI took over the Project from there. Cost? exactly what they estimated. No surprises.”
Questions
How long does a bathroom remodel take?
A bathtub remodel takes 2 days, a shower remodel 4 days and a double shower 5 days. Adding the bathroom floor adds 2 to 3 days. A complete renovation takes 2 to 3 weeks.
How much does a bathroom remodel cost?
A guest bathroom runs $20,000 to $40,000. A master bathroom runs $40,000 to $120,000. A shower or a tub on its own runs $15,000 to $25,000. Design, labor and materials are all included.
When do I pay?
All costs are shown at your design meeting. A $1,000 deposit starts the design and comes off your project total. The rest is due on completion.
Will the price change once work starts?
Rarely. We remove and replace everything in the wet area. If demolition uncovers a hidden problem, your project manager shows you the options before any extra work. These repairs usually run $100 to $500.
Can I live in my house during the remodel?
Yes. We take safety measures and use dust control, so you can live at home while we work.
Do I need HOA approval?
Usually not. An HOA typically has no say over work inside your house.
Who is my contact during the project?
Your designer during design, and your project manager during construction. Both are full-time Nomi employees.
What warranty do you give?
A 2-year workmanship warranty on labor and installation. Many materials also carry a manufacturer warranty, and we help you file the claim. Read the warranty policy
Where do you work?
Dallas-Fort Worth and the surrounding area, including Dallas, Fort Worth, Plano, Frisco, Southlake, Westlake, Highland Park, Prosper, and Addison.
The rooms we build

Start with a free consultation.
A free design and estimate meeting with our team. Bring your ideas, we bring the samples.